Hann Construction was engaged as Main Contractor to construct a new auditorium for the school with tiered seating. This was a large building over 250m2 which was completed with tiered seating over the toilet and amenities block. It was also fitted out with power and data services. A distinct feature of this building is the large curved wall in the main entry corridor.
September 2009
Large curved wall at main entry
Lonsdale Architectural